Studio Construction
Studio Construction
| After many coats of lacquer and lots of sanding, the trim is now up.
|
| | We added brackets for the cable sofits along the top of the wall
|
---|
| | Our friends Chuck (a great guitar player) and Tom (wonderful Mandolin player) stopped by to help run cable and enclose the sofits.
|
|
---|
|
| | Fabric covered pegboard backed with mineral wool is being used to stradle the ceiling/wall corner.
|
---|
| | Almost done. We have some smaller pieces to go up.
|
|
---|
Next is to install the wall plates and move the equipment in.
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | Previous | 12 | 13
[ Zephyr Room Homepage ]
|
| |