Studio Construction
Studio Construction


After many coats of lacquer and lots of sanding, the trim is now up.



We added brackets for the cable sofits along the top of the wall

Our friends
Chuck (a great guitar player) and
Tom (wonderful Mandolin player) stopped by to help run cable and enclose the sofits.



Fabric covered pegboard backed with mineral wool is being used to stradle the ceiling/wall corner.

Almost done. We have some smaller pieces to go up.

Next is to install the wall plates and move the equipment in.

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | Previous | 12 | 13


[ Zephyr Room Homepage ]